Waqas 48 Posted April 8, 2010 LAHORE: The power shortfall in the country has reached to 4810 MW as 11 to 14 hours load shedding makes common manÂ’s life miserable.According to PEPCO officials, the power production is 10015 MW as demand touches to 14810 MW.The duration of load shedding in cities is 11 to 14 hours, 20 hours in villages whereas industrial sector is facing 6 to 8 hours of load shedding.Prolonged power cuts also created water shortage in several areas. However, PEPCO officials are optimistic that load shedding will be reduce in coming days with the improved water situation in Tarbela and Mangla Dams. Share this post Link to post Share on other sites
shahabi 23 Posted April 8, 2010 OBviously @ my side there is 13 hours loadshadding..... Share this post Link to post Share on other sites